Tajikistan builds iron ore enrichment plant
Read also
An investment agreement was signed in Dushanbe between the Government of the Republic of Tajikistan and the Closed Joint Stock Company Tajik Metallurgical Combine on the construction and commissioning of an iron ore enrichment plant, Khovar reports.
The plant will be built with domestic investment and equipped with modern technology for the extraction and processing of iron ore and associated minerals, as well as the production and export of high-quality products.
The construction of the enterprise will be carried out in two stages: the first stage is planned to be commissioned by 2027, and the second by 2031. The design annual capacity of the enterprise is 2.5 million tonnes of ore extraction and processing, from which 1.1 million tonnes of concentrate will be obtained.
The enterprise will not only serve as an import substitute, but will also be largely focused on exporting its products.
The signing of the investment agreement is an important step towards attracting foreign and domestic direct investment and strengthening the country’s manufacturing and industrial capacity.









Tajikistan-Russia Trade Reaches $1.68B in January-August 2026
Tajikistan, Kuwait Discuss Expanding Social Protection Cooperation
Tajikistan, Qatar Discuss Boosting Bilateral Investment
TAJ-TECH 2026 Forum Issues Dushanbe Declaration on Innovation, Digital Technologies
Dushanbe Hosts Regional Forum on Digitalization, Telecommunications and ICT Development
Mavsuma Muini: “Women Make a Significant Contribution to Tajikistan’s Parliamentary Diplomacy”
Dushanbe Opens 20th Delphic Games for Young Artists
Dushanbe to Host Iranian Cinema Showcase During Toji Somon Awards
Tajikistan, Rome Museums Coordinate Preparations for International Exhibition
President Emomali Rahmon Visits Renovated Sirdaryo Teahouse and Releases 1 Million Fish Fingerlings
Tajik-Turkmen Relations Take Center Stage at Dushanbe Conference





