Final Reports Related to the Proposed Rogun HPP
1. Techno-Economic Assessment Study (TEAS), Phase II : Executive Summary
By Coyne Et Bellier
2. Techno-Economic Assessment Study (TEAS), Phase II : Summary
By Coyne Et Bellier
3. Techno-Economic Assessment Study (TEAS), Phase II : Design Criteria
By Coyne Et Bellier
4. Techno-Economic Assessment Study (TEAS), Phase II : Reservoir Operation
By Coyne Et Bellier
5. Techno-Economic Assessment Study (TEAS), Phase II : Reservoir Operation (Annexes)
By Coyne Et Bellier
6. Environmental and Social Impact Assessment (ESIA), Volume I: Text
By Poyry Energy Ltd.
7. Environmental and Social Impact Assessment (ESIA), Volume II: Annexes
By Poyry Energy Ltd.
8. Environmental and Social Impact Assessment (ESIA), Volume III: Environmental and Social Management Plan
By Poyry Energy Ltd.
9. Final Report of the Engineering and Dam Safety Panel of Experts
10. Final Report of the Environmental and Social Panel of Experts
11. Report on the 5th Riparian Information-Sharing and Consultation Process
By World Bank
12. Key Issues for Consideration on the Proposed Rogun Hydropower Project
By World Bank









President Emomali Rahmon Offers Condolences to the Sultan of Oman Haitham bin Tariq Al Said
President Emomali Rahmon Makes Personnel Changes
President Emomali Rahmon Receives the Deputy Chairman of the Cabinet of Ministers of Turkmenistan
President of Tajikistan Emomali Rahmon Meets President of the Asian Development Bank Masato Kanda
Meeting of the Government of the Republic of Tajikistan
President Emomali Rahmon Makes Personnel Appointments
President Emomali Rahmon Holds Security Council meeting
President Emomali Rahmon Receives the Prime Minister of the Republic of Uzbekistan Abdulla Aripov
President Emomali Rahmon, Received the Minister of Foreign Affairs of the Republic of Kazakhstan
President Emomali Rahmon Enacts New Laws





