Final Reports Related to the Proposed Rogun HPP
1. Techno-Economic Assessment Study (TEAS), Phase II : Executive Summary — By Coyne Et Bellier
2. Techno-Economic Assessment Study (TEAS), Phase II : Summary — By Coyne Et Bellier
3. Techno-Economic Assessment Study (TEAS), Phase II : Design Criteria — By Coyne Et Bellier
4. Techno-Economic Assessment Study (TEAS), Phase II : Reservoir Operation — By Coyne Et Bellier
5. Techno-Economic Assessment Study (TEAS), Phase II : Reservoir Operation (Annexes) — By Coyne Et Bellier
6. Environmental and Social Impact Assessment (ESIA), Volume I: Text — By Poyry Energy Ltd.
7. Environmental and Social Impact Assessment (ESIA), Volume II: Annexes — By Poyry Energy Ltd.
8. Environmental and Social Impact Assessment (ESIA), Volume III: Environmental and Social Management Plan — By Poyry Energy Ltd.
9. Final Report of the Engineering and Dam Safety Panel of Experts
10. Final Report of the Environmental and Social Panel of Experts
11. Report on the 5th Riparian Information-Sharing and Consultation Process — By World Bank
12. Key Issues for Consideration on the Proposed Rogun Hydropower Project — By World Bank