Final Reports Related to the Proposed Rogun HPP
1. Techno-Economic Assessment Study (TEAS), Phase II : Executive Summary
By Coyne Et Bellier
2. Techno-Economic Assessment Study (TEAS), Phase II : Summary
By Coyne Et Bellier
3. Techno-Economic Assessment Study (TEAS), Phase II : Design Criteria
By Coyne Et Bellier
4. Techno-Economic Assessment Study (TEAS), Phase II : Reservoir Operation
By Coyne Et Bellier
5. Techno-Economic Assessment Study (TEAS), Phase II : Reservoir Operation (Annexes)
By Coyne Et Bellier
6. Environmental and Social Impact Assessment (ESIA), Volume I: Text
By Poyry Energy Ltd.
7. Environmental and Social Impact Assessment (ESIA), Volume II: Annexes
By Poyry Energy Ltd.
8. Environmental and Social Impact Assessment (ESIA), Volume III: Environmental and Social Management Plan
By Poyry Energy Ltd.
9. Final Report of the Engineering and Dam Safety Panel of Experts
10. Final Report of the Environmental and Social Panel of Experts
11. Report on the 5th Riparian Information-Sharing and Consultation Process
By World Bank
12. Key Issues for Consideration on the Proposed Rogun Hydropower Project
By World Bank