Tajikistan builds iron ore enrichment plant
Read also
An investment agreement was signed in Dushanbe between the Government of the Republic of Tajikistan and the Closed Joint Stock Company Tajik Metallurgical Combine on the construction and commissioning of an iron ore enrichment plant, Khovar reports.
The plant will be built with domestic investment and equipped with modern technology for the extraction and processing of iron ore and associated minerals, as well as the production and export of high-quality products.
The construction of the enterprise will be carried out in two stages: the first stage is planned to be commissioned by 2027, and the second by 2031. The design annual capacity of the enterprise is 2.5 million tonnes of ore extraction and processing, from which 1.1 million tonnes of concentrate will be obtained.
The enterprise will not only serve as an import substitute, but will also be largely focused on exporting its products.
The signing of the investment agreement is an important step towards attracting foreign and domestic direct investment and strengthening the country’s manufacturing and industrial capacity.









Starlink Satellite Internet Launches in Tajikistan
Austrian Company Andritz Hydro Seeks to Expand Cooperation with Tajikistan
Ambassador of Tajikistan Meets with Chairperson of the Senate of Uzbekistan
Tajikistan and Japan Discuss Cooperation within Regional and International Organizations
Tajikistan’s Humanitarian Aid to the People of Gaza
Bilateral Cooperation Between Tajikistan and Azerbaijan Discussed in Dushanbe
Tajikistan Establishes Data Protection Center to Strengthen Cybersecurity
Center for Strategic Studies of Tajikistan Expands International Cooperation Network
Coins Dating Back to the 1st Century AD Discovered in Tajikistan
Trade Turnover Between Tajikistan and Pakistan Reaches $43 Million in 2025
Days of Kazakh Medicine to Be Held in Tajikistan in 2026
Tajikistan Highlights Investment Potential at B5+1 Forum in Bishkek





